Question 1
a) You have been tasked to select equipment for a new uranium open-pit mining operation. The
General Manager assigns you to give an overview of what considerations you would make in
selecting equipment for the entire operation. Highlight and explain the considerations you would
present to the company General Manager.
[SJ
b) Explain in detail how the equipment selection process fits into the surface mine optimization
process, clearly outlining its role and significance within the entire mine optimization and
evaluation framework.
[SJ
c) Evaluate the concept of in-pit crushing from a productivity and economic viewpoint.
[SJ
d) Evaluate the factors that affect slope stability in an open-pit mine, clearly outlining their
importance in maintaining slope stability.
[6J
e) State the factors one would consider in determining the following:
I. Bench height
[2J
II. Haul road location
[2J
Question 2
a) With reference to open-pit mining, explain how the following factors would govern bench height:
i. Degree of selectivity required in separating ore and waste.
[SJ
ii. Production rate.
[SJ
iii. Physical characteristics of the deposit.
[SJ
b) It is often necessary to consider the conversion of a surface mining operation to underground
mining operation. Evaluate the factors that you would consider in converting a surface mining
operation to an underground mining operation.
[lOJ
Question 3
You are presented with the following surface mine stripping operation:
Material parameters:
Volume to be excavated, hauled and compacted -
45 000m 3
Compaction factor -
0.93
Bank density
2 150 kg/m 3
Loose density -
1500 kg/m 3
Hydraulic excavator (1 unit available):
Bucket size -
8.2 m3
Bucket fill factor -
0.96
First bucket -
0.1 mins
Additional bucket -
0.7 mins
Truck transfer time -
0.5 mins
Maximum loader activity/hr -
52 mins
1