Planning, design, and construction supervision of the new fuel station, which included all
forecourt components and a convenience store/shop.
The engineering disciplines included Civil, Structural, Mechanical, and Electrical. New building
services required were sewer, storm water, fire protection, domestic water supply, bulk and
domestic electrical supplies, stand-by generator, air-conditioning & ventilation, refrigeration,
LPG, kitchen equipment, access control, CCTV, and ITC systems. Site works included bulk
earthworks, layer works, reinforced concrete, surfacing, paving, kerbing, parking with road
signage and markings.
The forecourt works included the steel canopy structure, underground fuel tanks, product
lines, electrical and communication, dispensers, spill containment areas, oil separator, storm
water, 3 pump islands, and 2 CoCs.
DESCRIPTION OF SERVICES
• Client liaison and coordination.
• Principle Agent.
• Coordination and management of project team, including architect, QS, branding
consultant, shop fitting contractor, and specialist service providers.
• Site Surveys.
• Geo-Technical Investigations.
• Preliminary designs and estimates.
• Detailed design of all Civil, Structural, Mechanical, and Electrical works.
• Contract documentation and procurement.
• Construction supervision.
Source: https ://www.Iithon.com/na mcor-reta il-fuel-station-i n-otavi/
Answer the following questions based on the case studies {Projects A and B) provided.
QUESTION 1
In the 21st century, the discipline of project management has gained popularity, however, the
environment in which projects operate is complex. With relevant examples from the case
studies discuss the environmental factors that may affect projects globally.
(20)
QUESTION 2
Project A makes reference to staff responsibilities, as a project management expect, outline
the characteristics of a high performing team, the stages of team development model and the
conditions of a high performing project team.
(20)