• The Copper is present in Calcine in the form of Cu2S,and Fe is in the form of FeSand
Fe2O3_Air is supplied and Sulphur burns to produce SO2.The overall roasting reaction is
simplified as: 2Cu + 3Fe + 3S + 5/202 = Cu2S+ FeS+ Fe2O3+ SO2
Calculate the following;
(a) Weight of calcine produced (5 marks)
(b) Volume of Air used in m3 per to roast the ore (10 marks)
(c) The weight of Fe2O3formed in the calcine (5 marks)
(d) Percentage sulphur removal (5 marks)
Question 3
(a) You are the Metallurgical Manager of an integrated Copper Smelter comprising Drying,
Smelting and Converting Plants. The Dryer develops a fault and has to undergo repairs for a
week. The feedstock for the smelter, and hence the Converter will run out in three days'
time at the normal plant throughput (rate). What options will you implement to avoid
cooling down the furnace and converter thus damaging refractories? (5 marks)
(b) According to Stokes' law, the rate at which matte droplets settle through a layer of slag is
given by;
V
_l Pctrop - Pslag (d. )2
g
Y"'drop
18
Pslag
In this expression V is the settling rate of the matte droplets (m/s), g the
gravitational constant (9.8 mis\\
Pdrop matte density (3900-5200
kg/m
3
),
PslJ& slag
density (3300-3 700 kg/m3), Psbg slag viscosity (~0.1 kg/m·s) and ¢10,11 the
diameter (m) of the settling matte droplet.
(i) Given that matte density is 5100kg/m 3, slag density is 4000kg/m 3and slag viscosity is 0.1
kg/m.s, calculate the settling velocities and residence times of matte droplets of radii in mm;
8; 5; 2; 1; 0.5 settling through l.0m of slag (10 marks)
(ii) Explain the practical steps the Plant Metallurgist should take to increase the settling rate of
the matte drops in slag and therefore increase the rate at which matte and slag separate in
the furnace/converter (5 marks)
(c) With the aid of a sketch, discuss the key features of the Imperial Smelting Process for Zinc
sulphide concentrates. Explain why it has become universally favoured as well as its
disadvantages (5 marks)