SECTION A — MULTIPLE CHOICE QUESTIONS (10 MARKS)
1. Which one is right definition of Six Sigma?
a) It's a performance improvement approach that seeks to find and eliminate causes of defects or
errors, reduce cycle times and cost of operations, improve productivity, better meet customer
expectations, and achieve higher asset utilization and returns on investment in manufacturing and
service processes.
b) It’s a tool used to measure performance
c) It’s an approach that seeks to increase causes of defects or errors
d) Can only be used in manufacturing industry
2. What's a unit of work?
a) It’s the output of a process or an individual process step
b) It’s aload
c) It’s the actual work done
d) Its work done by a group of people
3. Whatis a non-conforming unit of work?
a) Has one or more defects or errors
b) Its work done
c) Has no defect or errors
d) Has been completed according to specifications
4. What are measures in Six Sigma metrics?
a) Refers to the numerical information that results from measurement and are associated with a metric
b) They are as a result of a process steps
c) They are numerical values that are not associated with a metric
d) They have no significance to Six Sigma metrics
5. What is a process? mark the correct answer.
a) A sequence of activities that are intended to achieve some results
b) A procedure to follow
c) A set of rules
d) A routine operation
6. SMART is the abbreviation for
a) Smooth, Measurable, Actionable, Related, Timely
b¢d)))
Simple, Meaningful, Actionable, Related, Timely
Simple, Measurable, Actionable, Reasonable, Timely
Simple, Measurable, Actionable, Related, Timely
ts “Six sigma” is a
a) system that measures the productivity and performance of employees
b) defect- or error-based metric that equates to zero defects or errors per million opportunities
c) defect- or error-based metric that equates to 3.4 or fewer defects or errors per million opportunities
d) system without measures
8. Key Performance Measures in Services are about
a) Accuracy, Cycle time, Cost, Customer satisfaction
b) Accuracy, Down time, Cost, Customer satisfaction
c) Accuracy, Up time, Cost, Customer satisfaction
qd) Accuracy, Down time, Cost, Customer satisfaction